Sunday, March 21st, 2004

Today the garden started erupting. The crocuses have been up for a week or so -- some of them were crushed a bit by the snowstorm but others are in good shape. We did not really plant enough crocus bulbs for them to make a real impression of bloom. Tulip and daffodil greenery has been visible through the snow for a few days and after the rain yesterday that is the dominant thing in the garden. But many other bits of greenery are visible!

We spent this morning doing yard work -- raked up remaining leaves from the fall -- aerated the lawn and put some new seed on it and some fertilizer -- turned the compost which I have not touched since the fall, there is some stuff in there we will be able to use immediately. The idea was to start cleaning the garage out, which I want to convert to a work space (from a storage space), but that did not happen. (The plan for the garage is to put a long table against both side walls, and to put a door in the yard side. And possibly to insulate and sheet rock the walls.)

posted evening of March 21st, 2004: Respond
➳ More posts about The garden

Tuesday, January 13th, 2004

🦋 Pssst, steam heat

The sounds my house makes during the winter time are many. This was really brought home to me over the last week or so when we have been fighting a losing battle to keep our boiler from calling it quits. I would stand quiet, tense, listening to the peeps and gurgles of our pipes and trying to divine from them how much longer we had. Lately -- yesterday morning -- the plumber (Tom O'Neill of West Orange, whom I recommend highly) put a sealer compound into the boiler's tank which seems to be holding up, and victory may yet be ours; though I think in any case, we will need to buy a boiler in the spring time. Now I sit quiet, relaxed, listening to the peeps and gurgles of our pipes and to the house's frame creaking, and marvel at the degree of personality which I hear -- I believe I have come to know the house's voice a lot better in this interval.

One thing about steam pipes and radiators -- the verb "hiss" is used generically to describe the sound they make. But I think of the several sounds I hear the steam making, "hiss" accurately describes only two, both of which are sounds indicative of a problem -- these are the hiss of steam escaping from a broken air vent, and the distinct hiss of steam escaping from a cracked pipe. When steam remains inside the pipes where it belongs, it does not hiss. It sighs, pants, whooshes... and a couple of others that I have not yet come up with words to describe.

posted evening of January 13th, 2004: Respond
➳ More posts about Steam heat

Thursday, October 23rd, 2003

🦋 Project pix

Developed pictures of the two projects I have finished recently:

The Windowseat

The Stone Path

posted evening of October 23rd, 2003: Respond
➳ More posts about Window seat

Wednesday, October 8th, 2003

🦋 About molding

More window seat stuff. (The seat is completed and primed; it will not be painted until sometime this coming spring when we repaint the room. Pictures coming soon.) I wrote before about building the baseboard, which came out very well and looks great in the context of the room; the second molding I build, which is an apron under the "sill" at the front of the seat, was less successful, and I want to examine why, and what remedial steps I can take.

First an explanation of what I was going for. Behind the seat are three windows, each with a sill and an apron molding beneath the sill. ("Apron" is the stepped molding which transitions from the sill to the wall.) I wanted to echo this by having the seat top jut out beyond the seat front, and have an apron beneath it. My plan was, to make it jut out by the same amount the window sills project from the wall, and duplicate the measurements of the existing aprons. (Note: this is quite different from the plans I originally posted here back in June.) The dimensions in place (roughly): Window sills come out 2 1/2" from the wall; aprons extend 7" below the sills and come out 1 1/2" from the wall at the top of the apron, 3/4" at the bottom.

What I ended up with below the top of the seat is about the same; but it does not look quite right. The reason it does not, as I realized over the course of the past few days, is that the shadows are wrong. The purpose of the apron molding is to make a visual transition from the window sill to the wall; how this is done is by shadows falling where the apron depth changes. The apron I built is located diffently with respect to the light sources, and the shadows are not right. (Well two of them are.) I am going to leave it be for the time being, but eventually I think this could be corrected by making it deeper -- adding pieces in front of it. If I ever actually get around to this I will lay it out beforehand with a diagram of light sources to see what the shadows would end up looking like, before I start cutting.

posted afternoon of October 8th, 2003: Respond
➳ More posts about Projects

Sunday, September 14th, 2003

🦋 I built a baseboard

Yesterday I put the plywood shell onto the window seat and began the process of filling in molding around it. This consists mainly of: the baseboard, the sill, and the apron. I spent this morning working on the baseboard, and it looks pretty nice.

Our house has large moldings; the baseboard around the seat is about 6" tall and is made up of at least 4 separate pieces of wood, which I will refer to as base, head, cap, and toe. (Some of these may actually be made up of more than one piece but I will assume not.) The base is a rectangular piece 1" deep and 4 3/8" tall, with a 1/4" bevel at the top. The head is a rectangular piece 3/4" deep and 7/8" tall which rides on top of the base -- the bevel in the base meets the depth of the head. The cap is a sort of teardrop-shaped piece about an inch tall; and the toe is a 3/4" quarter-round piece which makes the transition from the base to the floor.

The first thing I did was to cut the base. The main work of this was planing the board I had, 1 3/16" thick, to 1" thickness; once I had that I had to figure out how to cope it to get the bevel to meet the bevels of the baseboard around the seat. Basically I did a straight cut 1/4" inside the end of the board that stopped 1/4" from the top, and then chopped an angle from the corner of the board to the end of the cut. It came out pretty well -- the coping is not perfect but it is well within the abilities of caulk and spackle to make it look just right. I attached this to the front of the seat with screws to hold it tight, and then nailed the head piece to it. (The head piece is the simplest, just a straight rectangular piece.)

Next came the toe, which I am quite happy with. I had taken the toe pieces out from behind the seat and used these, which I had to cope to make them meet up properly. The last thing is going to be the cap, which I also took out from behind the seat -- I am a bit nervous about whether it is going to work though, as in the original baseboard the cap is attached to the head with a rabbett, which I mostly broke when I was prying the cap off. I am going to plane the base of the cap pieces off flush and see how it works.

posted evening of September 14th, 2003: Respond

Sunday, September 7th, 2003

🦋 Weekend Update

A very productive weekend... The window seat frame is installed; the seat would be on except I found out home depot does not carry the plywood I am looking for. There is a lumber yard in Union which I will try next Saturday. Mike R. came over Friday to help me with the baseboard and the electrical outlet, which I wanted to move to the front of the seat; but the baseboard proved impossible to remove from the wall. So I left it in place and put the frame in front of it.

The molding has changed a lot; rather than a crown molding I have decided to use a window apron molding, which is more natural in the context and will fit in nicely with the window aprons behind the seat. I will be building it out of 6 pieces of wood and it may not be ready immediately.

We had a really nice jam session this afternoon, playing about 8 songs which is about double what we normally get to, and they were a lot of fun. With Jim, I came up with a new arrangement of House of the Rising Sun which really sounds like a distinctively new sound for that song, riffing on Dylan's version but quite different. Sylvia came (of her own accord) and stayed for about two hours of jamming -- quite breathtaking to me since we were not changing our jam much at all to accomodate her in it. (Before it started, Greg saw a hawk eating a squirrel in the lower branches of a tree on the property 3 doors down from Bob's place, so we went down there to watch it for 15 minutes.) Afterwards we had a cookout, for which Sylvia came back to join us.

posted evening of September 7th, 2003: Respond
➳ More posts about Sylvia

Monday, August 25th, 2003

🦋 Yard work

Today was spent digging. My back is sore, so are my legs, and my arms have very little energy left in them. I dug up the entire path in my front yard, about 25' X 1' X 8", and filled it with sand and started laying the stones in it. I had been planning to cut the stones to shape; but that turns out to be very difficult, so I am instead just hunting for stones of roughly the shape I need and using them as is. The beginning of the path looks pretty good, after several tries with different stones.

posted evening of August 25th, 2003: Respond
➳ More posts about Patio

Saturday, August 23rd, 2003

We're back in town -- the week was a flurry of fun activity. I would like to write a long post about it but I don't know whether I will or not -- I have other stuff to do this week like building a path in my yard and finishing the window seat. If you are dying to know about it send me a note and I will give that a higher priority.

posted evening of August 23rd, 2003: Respond

Sunday, August 10th, 2003

More progress tonight on the window seat -- it's just inside the bounds of possibility that I will finish it before the end of this month, which would be exciting since we're having a lot of people over on Labor Day, and I would be able to show it off to them. (Assuming it is worthy of being shown off...) Also that would make it a 2-month project from inception to completion, well under my average.

On Saturday my time in the shop was spent replacing a broken step on the staircase to our basement -- I cut it from a good stout piece of oak and rabbetted the ends to fit in the existing stringer. Then I helped Sylvia finish building a bed for her Clifford doll, a project we've been working on for about a week. She helped push the plane and helped turn the brace; we nailed on the legs and it was done. Clifford is sleeping in it now, on the floor nearby Sylvia's bed.

posted evening of August 10th, 2003: Respond

Thursday, August 7th, 2003

Geez, lots of stuff going wrong with my house this week -- a short circuit in the basement, water in the basement, a rotten piece of siding, and a broken step in the staircase going down to the basement. Lots of work for this weekend!

posted evening of August 7th, 2003: Respond
➳ More posts about Carpentry

Previous posts about Home improvement
Archives

Drop me a line! or, sign my Guestbook.
    •
Check out Ellen's writing at Patch.com.

Where to go from here...

Friends and Family
Programming
Texts
Music
Woodworking
Comix
Blogs
South Orange
readincategory